top of page
Mammoet involved in Expo 2020’s UAE pavilion build
Staff Report,
1 Mar 2022
Heavy lift specialist lifted and placed panels weighing 6-16t of the structure’s 28 iconic movable wings with a project schedule that minimised job-site disruption and mitigated risks from winds
RELATED ARTICLES
bottom of page